The project
An initial verification from the school’s maintenance team found that the existing lighting was under-performing, with only 50% of fittings operational. In addition, the existing lighting was becoming too costly to maintain as a scaffold tower was required to reach the fluorescent T8 non-corrosive fittings mounted at 6.4m.
The school appointed TJ Evers Building Contractors to lead the lighting refurbishment, who contacted P&M Electrical Wholesale in Colchester to research various lighting suppliers and request quotes for the job. NET LED’s Regional Sales Manager discussed the job specification with P&M to understand the school’s specific lighting requirements.
Following this, the Sales Team were able to provide a quote based on the optimum solution in terms of light quality and cost effectiveness.
P&M found that NET LED’s products not only fulfilled the light output requirements of the job specification; they also offered excellent energy savings and a 5 year guarantee.
Furthermore, P&M had worked with NET LED on other successful projects in the past, so they were confident in recommending NET LED products for this installation.